25/07/2003 11:16:07: Scheduler (5.7) starting. 25/07/2003 11:16:39: Scheduler quitting. 27/07/2003 18:48:59: Scheduler (5.7) starting. 27/07/2003 23:50:59: Scheduler (5.7) starting. 28/07/2003 00:14:33: Scheduler (5.7) starting. 28/07/2003 23:59:59: Running task (A:\). 29/07/2003 00:00:01: Possible failure running task (A:\). 29/07/2003 00:00:01: Failed to determine cluster size from drive A:\. Cluster tip area will not be erased. 29/07/2003 00:00:01: Failed to create temporary directory to drive A:\, maybe one exists already. Try again. 29/07/2003 00:00:01: Failed to erase unused space on A:\. 29/07/2003 19:12:02: Scheduler (5.7) starting. 29/07/2003 19:42:27: Scheduler (5.7) starting. 29/07/2003 20:57:09: Scheduler (5.7) starting. 29/07/2003 21:03:19: Scheduler (5.7) starting. 30/07/2003: Running task (A:\). 30/07/2003 00:00:01: Possible failure running task (A:\). 30/07/2003 00:00:01: Failed to determine cluster size from drive A:\. Cluster tip area will not be erased. 30/07/2003 00:00:01: Failed to create temporary directory to drive A:\, maybe one exists already. Try again. 30/07/2003 00:00:01: Failed to erase unused space on A:\. 30/07/2003 16:42:51: Scheduler (5.7) starting. 30/07/2003 16:52:37: Scheduler (5.7) starting. 30/07/2003 18:55:31: Scheduler (5.7) starting. 31/07/2003: Running task (A:\). 31/07/2003 00:00:01: Possible failure running task (A:\). 31/07/2003 00:00:01: Failed to determine cluster size from drive A:\. Cluster tip area will not be erased. 31/07/2003 00:00:01: Failed to create temporary directory to drive A:\, maybe one exists already. Try again. 31/07/2003 00:00:01: Failed to erase unused space on A:\. 31/07/2003 09:26:35: Scheduler (5.7) starting. 31/07/2003 13:25:20: Scheduler (5.7) starting. 31/07/2003 13:52:20: Scheduler quitting. 31/07/2003 14:04:36: Scheduler (5.7) starting. 01/08/2003: Running task (A:\). 01/08/2003 00:00:01: Possible failure running task (A:\). 01/08/2003 00:00:01: Failed to determine cluster size from drive A:\. Cluster tip area will not be erased. 01/08/2003 00:00:01: Failed to create temporary directory to drive A:\, maybe one exists already. Try again. 01/08/2003 00:00:01: Failed to erase unused space on A:\. 02/08/2003 00:00:10: Running task (A:\). 02/08/2003 00:00:11: Possible failure running task (A:\). 02/08/2003 00:00:11: Failed to determine cluster size from drive A:\. Cluster tip area will not be erased. 02/08/2003 00:00:11: Failed to create temporary directory to drive A:\, maybe one exists already. Try again. 02/08/2003 00:00:11: Failed to erase unused space on A:\. 03/08/2003: Running task (A:\). 03/08/2003 00:00:01: Possible failure running task (A:\). 03/08/2003 00:00:01: Failed to determine cluster size from drive A:\. Cluster tip area will not be erased. 03/08/2003 00:00:01: Failed to create temporary directory to drive A:\, maybe one exists already. Try again. 03/08/2003 00:00:01: Failed to erase unused space on A:\. 03/08/2003 05:01:31: Scheduler (5.7) starting. 04/08/2003: Running task (A:\). 04/08/2003 00:00:02: Possible failure running task (A:\). 04/08/2003 00:00:02: Failed to determine cluster size from drive A:\. Cluster tip area will not be erased. 04/08/2003 00:00:02: Failed to create temporary directory to drive A:\, maybe one exists already. Try again. 04/08/2003 00:00:02: Failed to erase unused space on A:\. 04/08/2003 10:18:35: Scheduler quitting. 04/08/2003 10:23:08: Scheduler (5.7) starting. 04/08/2003 10:37:34: Scheduler (5.7) starting. 04/08/2003 18:31:43: Scheduler (5.7) starting. 05/08/2003: Running task (A:\). 05/08/2003 00:00:01: Possible failure running task (A:\). 05/08/2003 00:00:01: Failed to determine cluster size from drive A:\. Cluster tip area will not be erased. 05/08/2003 00:00:01: Failed to create temporary directory to drive A:\, maybe one exists already. Try again. 05/08/2003 00:00:02: Failed to erase unused space on A:\. 05/08/2003 08:32:58: Scheduler quitting.